top of page

Sherman Street and Eberts Lane

Bridge Construction

  • Longer bridge spans over Mill Creek help keep the stream within the channel and reduce flooding of I-83 in this area

  • Innovative design for Sherman Street adds a new 3rd span to the existing bridge for the future relocated Mill Creek

imgdotfhwalg.png
PennDOT.png
Stantec Logo - Black (RGB)_edited.png
SL logo final (small).jpg
NTM Logo.jpg
wra 100 year_rgb_color.png
SPK-LOGO.PNG
Asset 1.png
SQCivil Logo Transparent Logo.png
KCI_Holdings_White.png
bottom of page